Finishing Schedule Drawing for Doors, Windows, and Rolling Shutters

Posted by:

|

On:

|

,

How to Prepare a Finishing Schedule Drawing for Doors, Windows, and Rolling Shutters

A finishing schedule for doors, windows, and rolling shutters is essential in architectural and construction projects to specify the materials, finishes, colors, and types of hardware for each element. It helps ensure consistency, quality control, and accurate execution during construction.


1. Purpose of a Finishing Schedule for Doors, Windows, and Rolling Shutters

โœ”๏ธ Provides detailed specifications for all openings in a building.
โœ”๏ธ Helps in material procurement and cost estimation.
โœ”๏ธ Ensures aesthetic consistency and durability.
โœ”๏ธ Reduces errors in installation and execution.
โœ”๏ธ Follows building code compliance (fire rating, ventilation, security, accessibility).


2. Key Components of a Doors, Windows, and Rolling Shutter Finishing Schedule

A finishing schedule includes the following:

ElementMaterialFinishColor / TextureHardware / AccessoriesRemarks
DoorsSolid Wood, Metal, uPVCPolished, Laminated, PaintedNatural Wood, White, Dark BrownSS Hinges, Locks, Handles, Door ClosersFire-rated for staircases
WindowsAluminum, uPVC, SteelPowder Coated, AnodizedWhite, Black, BronzeSliding, Casement, FixedDouble glazing for insulation
Rolling ShuttersGalvanized Steel, AluminumPowder Coated, PaintedGrey, MetallicManual, MotorizedSecurity-rated, Wind-resistant

3. Steps to Prepare a Finishing Schedule Drawing

Step 1: Identify Door, Window, and Rolling Shutter Types

  • Doors: Main entrance, internal doors, fire-rated doors, sliding doors, flush doors.
  • Windows: Fixed, sliding, casement, bay windows, double-glazed units.
  • Rolling Shutters: Manual or motorized, security-rated, industrial rolling shutters.

Step 2: Select Materials and Finishes

  • Choose based on functionality, durability, and aesthetics.
  • Specify paint, polish, powder coating, or laminate types.
  • Ensure finishes comply with fire and weather resistance standards.

Step 3: Create a Finishing Schedule Table

Use AutoCAD, Revit, or Excel to create a tabular format detailing the finish, color, and hardware.

Step 4: Link with Architectural Drawings

  • Use symbols or legends in floor plans, elevations, and sections.
  • Label each door, window, and rolling shutter with a unique ID (e.g., D1, W2, RS1).

Step 5: Prepare Detailed Drawings

  • Door Schedule โ€“ Shows door type, material, size, frame details, finish, and fire rating.
  • Window Schedule โ€“ Includes type, size, glazing, frame material, finish, and ventilation details.
  • Rolling Shutter Details โ€“ Specifies curtain type, slat thickness, operation type, and safety features.

Step 6: Approval and Finalization

  • Review with architects, engineers, and contractors.
  • Cross-check with BOQ and material availability.
  • Ensure compliance with local building codes and standards.

D:\Website\Industrail std dwg\std dwg\LAyout and details of WorkShop Building-Model.pdf\FINISHING SCHEDULE.jpg

4. Example Finishing Schedule Table for Doors, Windows, and Rolling Shutters

IDTypeMaterialFinishColorSize (mm)HardwareRemarks
D1Main DoorTeak WoodPolishedNatural Wood1200×2400SS Hinges, Digital LockFire-rated
D2Interior DoorFlush WoodLaminatedWhite900×2100SS Hinges, Lever HandleOffice Use
W1Sliding WindowAluminumPowder CoatedBlack1500×1200Double GlazedInsulated Glass
W2Casement WindowuPVCAnodizedWhite1200×1500Safety LocksVentilated
RS1Rolling ShutterGalvanized SteelPowder CoatedGrey3000×4000Motorized with RemoteWind-resistant

5. Software Used for Finishing Schedule Drawings

  • AutoCAD โ€“ Drafting and detailing the schedule.
  • Revit โ€“ 3D modeling with material specifications.
  • SketchUp โ€“ Visualization of doors, windows, and shutters.
  • Excel / Google Sheets โ€“ Creating tabular schedules for easy reference.

6. Best Practices for Preparing a Finishing Schedule

โœ”๏ธ Use consistent numbering (D1, D2, W1, W2, RS1).
โœ”๏ธ Include detailed annotations and legend in architectural drawings.
โœ”๏ธ Use fire-rated doors and security shutters where required.
โœ”๏ธ Ensure glazing specifications meet insulation and acoustic standards.
โœ”๏ธ Standardize color and finish codes for procurement.


7. Conclusion

A well-prepared doors, windows, and rolling shutter finishing schedule ensures accurate execution, cost efficiency, and quality control in a construction project. By following systematic planning, clear documentation, and proper coordination, architects and engineers can avoid material mismatches, delays, and installation errors.